Kundservice
How Megaprojects Are Damaging Nigeria and How to Fix It (häftad, eng)

Springer Nature Switzerland AG

How Megaprojects Are Damaging Nigeria and How to Fix It (häftad, eng)

489 kr

489 kr

Tidigare lägsta pris:

499 kr

Få kvar

Tis, 29 okt - ons, 30 okt


Säker betalning

Nöjd kund-löfte

30 dagars öppet köp


Produktbeskrivning

1 Introduction: The Project Abandonment Problem.
References.
2 What We Know About the Management of Very Large Projects.
2.1 Project Success Factors as Lists.
2.2 The Project Success Frameworks of Miller and Lessard and Morris and Hough.
2.2.1 Miller and Lessard (2000).
2.2.2 Morris and Hough (1987).
2.3 The Nigerian Context.
2.4 The Extended Theoretical Framework.
2.5 What About Corruption?.
References.
3 Structure of the Investigation.
3.1 Overview of the Approach Taken in This Study.
3.2 Construction and Execution of the Survey.
3.3 Construction of the Sample of Projects.
3.4 Construction of the Case Studies.
Appendix: Full Questionnaire as It Was Administered.
Our Request.
Project Variables.
References.
4 A Description of the 38 Matched Projects.
4.1 Lagos-Ibadan Express Road.
4.2 Lagos-Badagry Express Road.
4.3 Third Mainland Bridge.
4.4 Second Niger Bridge.
4.5 Egbin Power Station.
4.6 Calabar Power Station.
4.7 Zungeru Hydropower Plant.
4.8 Delta State (Oghareki) Power Plant.
4.9 Shiroro Hydroelectric Power Station.
4.10 Omoku Power Plant Station.
4.11 Mambilla Hydroelectric Power.
4.12 Ajaokuta Steel Project.
4.13 Kanji Dam.
4.14 Otukpo Dam.
4.15 Nigeria Satellite 2.
4.16 Nigeria Satellite 1.
4.17 Airtel Nigeria.
4.18 Nigerian Telecommunications Limited (NITEL).
4.19 Godswill Akpabio International Stadium.
4.20 (Samuel) Ogbemudia Stadium.
4.21 Abuja International Airport.
4.22 Lagos MMA2 Airport.
4.23 Yenagoa International Cargo Airport.
4.24 Jigawa Airport Project.
4.25 Tin Can Island Port.
4.26 Calabar Seaport.
4.27 Victoria Garden City (VGC) Housing Estate.
4.28 Festac Town Federal Housing Estate.
4.29 1004 Housing Estate.
4.30 Abuja Mass Federal Housing Project.
4.31 Olusegun Obasanjo Presidential Library.
4.32 Abuja National Library.
4.33 Nigerian Youth Empowerment Scheme (N-Power).
4.34 Nigeria Subsidy Reinvestment and Empowerment Programme (SURE-P).
4.35 Lagos State Waste Management Authority (LAWMA).
4.36 Cleaner Lagos Initiative (Visionscape).
4.37 University College Teaching Hospital (UCH) Ibadan.
4.38 University of Abuja Teaching Hospital (UATH).
References.
5 Insights from the Analysis of the Questionnaires.
5.1 Variable Distributions and Variable Capability to Detect Differences Across Projects.
5.1.1 Each Respondent Type Adds Unique Perspectives and Information.
5.1.2 The Variables Capture Robust Differences Between Abandoned and Completed Projects.
5.2 Condensing Variables into Aggregated Success Factors.
5.2.1 Approach.
5.2.2 Identifying the Factors.
5.3 Econometric Prediction of Project Completion.
5.4 Econometric Prediction of Cost and Schedule Overruns for Completed Projects.
5.4.1 Effect of Variables on Budget Overruns.
5.4.2 Effect of Variables on Schedule Overruns.
5.5 The Corrosive Effect of Corruption.
Appendix 1 Correlations Among Independent Variables Across All 114 Responses.
Appendix 2 Factor Analysis.
Appendix 3 Specification of the Logistical Regression.
Appendix 4 The Logistical Completion Probability Regression by Respondent Group.
Appendix 5 Robustness Analysis: Cost Overrun Regressions by Respondent Group.
Appendix 6 Robustness Analysis: Schedule Overrun Regressions by Respondent Group.
6 Two Library Projects.
6.1 The National Library of Nigeria in Abuja: An Abandoned Project.
6.1.1 Project Initiation.
6.1.2 Contract Signature and Execution.

Vikt, gram

500

Artikel.nr.

7cec5040-6bd6-4d2a-a157-784e88c584f1

Fyndiq har inget eget lager utan arbetar med enskilda butiker som lagerhåller produkter i och utanför Sverige, Europeiska unionen (EU) och Europeiska ekonomiska samarbetsområdet (EES).

Din beställning skickas från respektive butiks egna lager inom 24 timmar (helgfri måndag till fredag) från det att Fyndiq har bekräftat köpet med en beställningsbekräftelse till dig.

Produkterna levereras till dig inom 1-21 arbetsdagar, beroende på produkt, antingen direkt i din brevlåda eller till ditt närmsta ombud. Om du beställt produkter från olika butiker så skickas de i separata paket.
Beräknat leveransdatum ser du alltid på produktkortet och i din beställningsbekräftelse.

Snabbare leverans
Snabbare leverans, uppges på produkter vars beräknad leveranstid är mellan 1-3 arbetsdagar

Längre leveranstid
Längre leveranstid, uppges på produkter vars beräknad leveranstid är mer än 13 arbetsdagar

Fraktkostnad
Frakten kostar endast 29 kr! Det tillkommer inga ytterligare frakt- eller leveranskostnader efter köpet.

Springer Nature Switzerland AG

How Megaprojects Are Damaging Nigeria and How to Fix It (häftad, eng)

489 kr

489 kr

Tidigare lägsta pris:

499 kr

Få kvar

Tis, 29 okt - ons, 30 okt


Säker betalning

Nöjd kund-löfte

30 dagars öppet köp